EAF: Install day 2

EAF_wiringspeakers

I have a very sore set of legs and a cranky back from eight hours of sitting on the freezing concrete floor of the EAF space today.    The ongoing install is going according to plan from the perspective of my sound design and the detritus sculpture I’m building with Lauren.  Ryan’s light boxes are coming together well and are going the be a great presence across the space, whilst Jen and Ed’s projections look very effective as well.  I’m looking forward to seeing Charissa’s wall/floor detail come together tomorrow as she arrives for the final day of install before the opening on Thursday evening.

As per usual, there are lots of photos on the Flickr set: http://www.flickr.com/photos/7528804@N04/sets/72157620043499416/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s